Back-Priming
Sealing every face before installation.
Want new wood siding that lasts? Get it primed, gapped and flashed so it dries out instead of rotting.


New wood siding lasts when it can dry. Good installs prime every side of each board, including the back and cut ends, and many leave a small gap behind the siding so air can move.
Flashing at windows, doors and roof lines matters even more with wood in Charlotte's humid climate, because wet wood rots.
Talk to a contractor near you about new wood siding.
Sealing every face before installation.
Air space behind the siding to dry it.
Fasteners that won't stain the wood.
Boards kept up off soil and paving.

Wood usually costs more than vinyl to install and maintain.
Planning new wood siding? Call and talk it through.
Call (980) 866-4994It slows moisture from soaking in from behind.
Cedar is common for its natural rot resistance.
In Charlotte's local historic districts (Dilworth, Fourth Ward, Hermitage Court, McCrorey Heights, Oaklawn Park, Plaza Midwood, Wesley Heights and Wilmore), exterior changes need a Certificate of Appropriateness from the Historic District Commission before work starts.
The contractor sets the schedule; ask when you talk to them.
A contractor can price the boards, finish and install.